Pastificio Rana headquarter
New production line
San Giovanni Lupatoto (Vr)
As part of the expansion of the San Giovanni Lupatoto production area, Dabster took care of the final design of all the systems. Specifically, Dabster designed the new production line, the new cell serving shippers, the new sorting cell with water treatment plant for washing the cell itself and the new ammonia refrigeration unit with a power exceeding 1000 kW. It also took care of the refurbishment of the company shop systems and the refurbishment of the water dosing line for food production.
Finally, Dabster provided the construction management of the electrical and mechanical systems, energy consultancy, the drafting of the final “As built” drawings and the executive design of the underground services.
Place
SAN GIOVANNI LUPATOTO (VR)
Tipology
INDUSTRIAL BUILDINGS
Year
2021
Status
COMPLETED
Client
PASTIFICIO RANA
Activities
MEP DESIGN AND CONSTRUCTION SUPERVISION. ENERGY CONSULTANCY